Commit Graph

95 Commits

Author SHA1 Message Date
Mikayla Fischler
58cf383c91 #185 disable auto mode changing if auto mode is active regardless of assignment 2023-03-01 22:37:28 -05:00
Mikayla Fischler
3f15ae6b6f #179 remove recolor option from coordinator config 2023-02-27 23:59:46 -05:00
Mikayla Fischler
2b8f71fc43 status message cleanup and some updated comments 2023-02-26 14:22:25 -05:00
Mikayla Fischler
fbb992ff12 #173 dump excess steam on opening emergency coolant 2023-02-25 14:11:40 -05:00
Mikayla Fischler
523ac91c3b fixed coordinator RCS annunciator dimensions 2023-02-25 13:25:23 -05:00
Mikayla Fischler
bd1625c42e #166 removed sounder test code from GUI 2023-02-25 12:51:37 -05:00
Mikayla Fischler
225ed7baa1 #118 removed some coordinator nodiscard tags 2023-02-22 23:20:59 -05:00
Mikayla Fischler
4340518ecf #118 coordinator code cleanup 2023-02-22 23:09:47 -05:00
Mikayla Fischler
82ea35168b #118 type cleanup 2023-02-21 12:40:34 -05:00
Mikayla Fischler
c18e7ef4d0 display turbine generation as rate instead of charge 2023-02-16 20:48:40 -05:00
Mikayla Fischler
2babd67198 #162 #168 status indicator for emergency coolant, display number of connected RTUs, added RCS hardware fault and radiation warning indicators 2023-02-15 19:52:28 -05:00
Mikayla Fischler
199ce53f52 #160 #161 linked up ASCRAM lights and added ASCRAM radiation condition 2023-02-14 22:55:40 -05:00
Mikayla Fischler
1fe2acb5c5 #144 added radiation monitor integration; displays, unit alarms, connection states, other bugfixes 2023-02-13 22:11:31 -05:00
Mikayla Fischler
ef27da8daf fixed incorrect text for boiler status on coordinator 2023-02-13 18:53:24 -05:00
Mikayla Fischler
ff1bd02739 #20 process target charge level 2023-02-11 00:21:00 -05:00
Mikayla Fischler
44d5cec1f8 #19 decent rate PID gains, fixed blade counting and added checks, bugfix with PLC reconnects not being in auto mode, logging cleanups 2023-02-09 22:52:10 -05:00
Mikayla Fischler
37f7319494 #154 increased auto burn rate precision 2023-02-08 20:26:13 -05:00
Mikayla Fischler
07ee792163 #153 facility alarm acknowledge button 2023-02-07 18:44:34 -05:00
Mikayla Fischler
1d3a1672c8 #102 #21 auto control loop with induction matrix and unit alarm checks and handling 2023-02-07 00:32:50 -05:00
Mikayla Fischler
c77993d3a0 bottom align process control panel and induction matrix view 2023-02-05 12:15:41 -05:00
Mikayla Fischler
3e74d6c998 #101 initial coordinator control interface completed 2023-02-05 02:07:54 -05:00
Mikayla Fischler
b5c70b0d37 fixed process controller assuming ramp complete if burn rate setpoint was identical to setpoint before process control start 2023-02-04 13:47:00 -05:00
Mikayla Fischler
ba8bfb6e14 #101 fixed averages and display them 2023-02-03 21:05:21 -05:00
Mikayla Fischler
a117d5ee97 #150 save and automatically set priority groups, added checks to set waste and set group commands, restore waste mode control if operation failed 2023-02-03 16:40:58 -05:00
Mikayla Fischler
72791d042b #149 validate display sizes on startup 2023-02-03 15:19:00 -05:00
Mikayla Fischler
53e4576547 some coordinator code cleanup and refactoring 2023-02-02 23:07:09 -05:00
Mikayla Fischler
2e78aa895d #101 #102 burn rate process mode functional 2023-02-02 22:58:51 -05:00
Mikayla Fischler
fe71615c12 #101 #102 work on bugfixes; disable unit controls while in auto mode 2023-02-01 21:55:02 -05:00
Mikayla Fischler
e9562a140c #143 #103 #101 #102 work in progress auto control, added coordinator controls, save/auto load configuration, auto enable/disable on reactor PLC for auto control (untested) 2023-01-26 18:26:26 -05:00
Mikayla Fischler
8abac3fdcb refactoring and adjusted spinbox and hazard button elements 2023-01-23 15:10:41 -05:00
Mikayla Fischler
4145949ba7 #141 setting unit limits with coordinator 2023-01-15 13:11:46 -05:00
Mikayla Fischler
ca2983506e #24 coordinator/supervisor setting process groups and unit burn rate limits 2022-12-18 13:56:04 -05:00
Mikayla Fischler
93a0dedcb1 #24 GUI for unit displays to set unit group 2022-12-13 15:18:29 -05:00
Mikayla Fischler
a591cab338 color reactor coolant bars based on coolant type 2022-12-11 10:51:45 -05:00
Mikayla Fischler
a633f5b4c3 #132 expanded unit displays to use 4x4 monitors 2022-12-10 23:56:07 -05:00
Mikayla Fischler
6517f78c1c #129 induction matrix view 2022-12-10 15:44:11 -05:00
Mikayla Fischler
03f0216d51 #130 facility data object, some code cleanup, comms protocol changed from 1.0.1 to 1.1.0 2022-12-10 13:58:17 -05:00
Mikayla Fischler
52603e3579 #131 first pass of unit status text 2022-12-06 23:39:35 -05:00
Mikayla Fischler
c23ddaf5ea #135 added clock and supervisor trip time to coordinator main view 2022-12-06 11:40:13 -05:00
Mikayla Fischler
6bdde02268 #131 start of unit status text, added updating coordinator waste processing option on reconnect 2022-12-05 16:17:09 -05:00
Mikayla Fischler
4030fdc5c9 #77 alarm sounder 2022-12-04 13:59:10 -05:00
Mikayla Fischler
d4ae18eee7 #10 #133 alarm system logic and display, change to comms to support alarm actions, get_x get_y to graphics elements, bugfixes to coord establish and rtu establish, flashing trilight and alarm light indicators 2022-11-26 16:18:31 -05:00
Mikayla Fischler
3685e25713 likely finalized color palette, removed color map from unit displays 2022-11-21 21:32:45 -05:00
Mikayla Fischler
9c32074b56 #128 limit max burn rate control to actual max burn rate 2022-11-17 11:58:14 -05:00
Mikayla Fischler
c93a386e74 #127 adjusted annunciator rate/feed checks 2022-11-17 11:20:53 -05:00
Mikayla Fischler
8e28dbf2a6 #120 fixed steam dump indicator, fixed index tags 2022-11-11 16:59:28 -05:00
Mikayla Fischler
ffeff86507 adjusted containment integrity to just be damage percent, moved up radiation indicator 2022-11-11 16:32:14 -05:00
Mikayla Fischler
af57c3b1fc automatic reactor scram functionality for future use 2022-11-11 16:15:44 -05:00
Mikayla Fischler
c221ffa129 #81 handle force disabled 2022-11-11 15:45:46 -05:00
Mikayla Fischler
83cf645da4 #107, #121 RTU build changes, formed handling 2022-11-11 14:59:53 -05:00